The NH-ICS240-261 is an integrated energy storage and DC fast-charging system that combines a 261 kWh lithium iron phosphate battery with configurable EV charging power ratings of 120, 150, 180, 210 and 240 kW in a single floor-standing cabinet measuring 1,360 × 1,600 × 2,350 mm. Instead of demanding a grid connection large enough to serve every vehicle at full power simultaneously, it uses the NH-ICS240-261 charging station battery as a buffer — drawing a modest, predictable supply from the grid and releasing high power to vehicles when they plug in. For site owners facing a transformer limit, a costly capacity upgrade or punishing demand charges, that architecture changes the economics of fast charging entirely.

This guide explains how the system works, what the published specifications actually mean in operation, how peak shaving and load shifting generate value, and how to specify the unit correctly for a real site.

What Is the NH-ICS240-261?

The NH-ICS240-261 is a combined ESS and EV charger: a 261 kWh battery energy storage system and a dual-port DC fast charger in one enclosure. Nenghui positions it as a highly integrated design for locations where space is limited and the grid connection cannot be expanded cheaply — the two constraints that most often kill fast-charging projects during site feasibility.

Its identity is best understood through three roles it performs at once:

  1. A DC fast charger — up to 240 kW of configurable charging power across two output ports, with connector options spanning CCS2, CCS1, GBT, CHAdeMO and NACS.
  2. A battery energy storage system — 261 kWh of LiFePO4 capacity (248 kWh usable at 95% depth of discharge) at 832 VDC nominal, rated 0.5C, with a stated cycle life of 8,000 cycles.
  3. A grid-side asset — a system that shaves peak demand, shifts energy purchase into cheaper hours, and can absorb surplus PV generation where a PV input interface is configured.

Because all three functions share one cabinet, one civil works package, one commissioning process and one cloud connection, the installed cost and the site footprint both fall compared with assembling separate chargers and a separate battery container.

image

Key Specifications at a Glance

EV charging (DC output)

ParameterSpecification
Configurable power ratings120 / 150 / 180 / 210 / 240 kW
Output voltage range150–1,000 VDC
Max. output current (system)400 A
Output current (connector)200 A,250 A, 300 A, 350 A, 400 A optional
Max. output power (tabulated config.)240 kW
Number of output ports2
Connector typesCCS2, CCS1, GBT, CHAdeMO, NACS (any two)
Voltage accuracy±0.5%
Current accuracy±1%
Charging cable length5m, Other lengths upon request

Grid-side AC input: 3-phase 400 VAC ±10%, 50/60 Hz, 3P+N+PE · 3Φ 200 A rated current · 125 kW max input power · ≥0.99 power factor · ≥97% charging efficiency.

Battery energy storage: 261 kWh · 248 kWh usable at 95% DoD · 832 VDC nominal, 728–936 VDC range · LiFePO4 · 0.5C charge/discharge · 125 kW max charge · 130.5 kW max discharge · 8,000 cycles · battery liquid cooled, charging system air cooled.

General data: −30 °C to 50 °C operating (derating above 45 °C) · −10 °C to 45 °C storage · <95% RH non-condensing · ≤2,000 m altitude · 1,360 × 1,600 × 2,350mm · ≤3,000 kg · IP55 & IK10 (HMI IK8) · floor-standing · composite detector + aerosol fire suppressant · UN38.3、IEC62477、EN61000、IEC62619、IEC60730、IEC61851、ISO15118 · OCPP 1.6J upgradable to 2.0.1 · Ethernet, Wi-Fi, 4G · MID-certified meter · 21.5″ touchscreen, RFID/QR/app/POS · optional PV input interface and advertising screen.

Specifications as published by Nenghui for the NH-ICS240-261. Site-specific values depend on configuration; confirm the final datasheet for your build.

Why Battery-Buffered Charging Exists: The Grid Connection Problem

A 240 kW charger that runs at full power draws more than most commercial sites are permitted to import. The usual consequence is one of three outcomes, all unattractive: a costly connection upgrade (new transformer, switchgear and utility works that can dominate project capex and add months to the schedule); a smaller charger (slower sessions, customers lost to faster sites); or demand charges that punish every peak, because the site pays for its single highest interval of the month, every month.

NH-ICS240-261 EV charger storage exists to break that trade-off. The battery sits between the grid and the vehicle: the grid supplies a smoothed, limited load while the battery contributes the short, high-power bursts that fast charging demands. Nenghui’s own product highlights describe the platform as supporting up to 240 kW of EV charging power, with 0.5C battery ratings and a 125 kW maximum grid-side input — the gap between those figures is what the battery covers.

For a site with an existing connection, that means fast charging can often be deployed without a utility capacity upgrade, which is frequently the difference between a viable project and an abandoned one.

NH-ICS240-261 ESS Charger: How the Architecture Works

As an NH-ICS240-261 ESS charger, the unit integrates four subsystems that are normally separate products:

  1. The battery block. LiFePO4 cells at 832 VDC nominal, 261 kWh installed, liquid cooled, rated 0.5C for both charge and discharge. Usable energy is quoted at 248 kWh at 95% depth of discharge — a realistic figure rather than a nameplate-only number, which matters when you are modelling how many vehicles a site can serve per day.
  2. The grid interface. Three-phase 400 VAC input with 200 A rated current, ≥0.99 power factor and ≥97% charging efficiency. High efficiency here is not a marketing detail: every point of conversion loss is energy the owner buys and does not sell.
  3. The DC charging stage. 150–1,000 VDC output covering the full range of modern passenger EVs and light commercial vehicles, 400 A system current, two ports, and connector flexibility across CCS2, CCS1, GBT, CHAdeMO and NACS — the practical requirement for sites serving mixed vehicle fleets or international traffic.
  4. The control and communications layer. A 21.5″ touchscreen, RFID/QR/mobile-app authentication, MID-certified metering for billing accuracy, and OCPP 1.6J with an upgrade path to OCPP 2.0.1 for network operators who need Plug & Charge, smart charging profiles or bidirectional readiness.

Physically, the design is built for constrained sites: floor-standing, roughly 1.4 × 1.6 m of ground area, IP55 and IK10 rated for outdoor installation, with an access hole, wiring entrance and rail-mounted components to simplify installation and maintenance. The optional PV input interface lets a site couple on-site generation directly into the same asset.

image

NH-ICS240-261 Peak Shaving Charger: Controlling Demand Charges While You Charge

Peak shaving is the practice of capping the site’s maximum import from the grid, and it is where an integrated system pays for itself fastest on commercial tariffs.

An NH-ICS240-261 peak shaving charger works by monitoring site load and discharging the battery whenever demand approaches a configured ceiling. When the charger and the building load would together exceed the site’s limit, the battery supplies the difference. The grid never sees the spike, so the billed maximum demand stays flat — and on tariffs where demand charges dominate the bill, that single behaviour can remove a large share of the monthly cost.

Three practical consequences: fast charging without capacity upgrades, because the battery covers the peaks that would otherwise require a larger connection; multiple chargers on one constrained supply, because the site ceiling is enforced centrally; and predictable operating cost, because operators can forecast energy and demand cost per session instead of paying for occasional spikes.

For fleet depots — where vehicles return in the evening and charge in a narrow window — peak shaving is often the difference between a viable tariff position and an untenable one.

NH-ICS240-261 Load Shifting Storage: Buy Cheap, Dispatch Smart

Load shifting is the companion strategy: instead of only capping peaks, the system changes when energy is bought.

NH-ICS240-261 load shifting storage charges the battery during low-price, low-load hours — overnight on a time-of-use tariff, or in the middle of the day when on-site PV generation would otherwise be curtailed or exported at a low price — and then discharges into evening or peak periods, either into vehicles or into the building.

The value stack: tariff arbitrage (buy off-peak, sell to drivers or the building at peak rates; with 248 kWh usable per cabinet and 0.5C ratings, one unit can shift meaningful volume daily); self-consumption of PV (surplus generation charges the battery instead of being exported for little value); renewable capacity support (absorbing generation peaks the local grid would otherwise refuse); and resilience (the same battery maintains service during grid disturbances and keeps critical loads supplied when the site is islanded).

Because the system performs both peak shaving and load shifting with the same hardware, the investment is justified by two independent revenue streams rather than one — a materially better business case than either a standalone charger or a standalone battery.

Safety, Standards and Site Compliance

DC fast charging and lithium batteries both attract scrutiny from insurers, authorities and network operators. The NH-ICS240-261 addresses that with AI-based early warning (anomaly detection that flags abnormal cell behaviour before it becomes an event); a composite detector plus aerosol fire suppressant at cabinet and pack level, designed to prevent heat diffusion and thermal runaway propagation; comprehensive electrical protection (overvoltage, undervoltage, overload, residual current, overtemperature, ground, surge and short-circuit protection, fault self-diagnosis and insulation detection); environmental hardening (IP55 and IK10 with HMI at IK8, −30 °C to 50 °C with derating above 45 °C, function to 2,000 m); and documented compliance — UN38.3、IEC62477、EN61000、IEC62619、IEC60730、IEC61851、ISO15118.

Two of these deserve attention during procurement. First, IEC 61851-23 and IEC 62196 govern DC charging safety and connector compatibility respectively — evidence that the charging function, not just the battery, is engineered to standard. Second, MID-certified metering matters wherever energy is resold to drivers, because billing accuracy is a regulatory requirement in many markets, not a convenience.

Smart Operations: OCPP, Cloud Monitoring and Fleet Integration

A charging asset is only as useful as the software around it. The NH-ICS240-261 ships with OCPP 1.6J and an upgrade path to OCPP 2.0.1 — the protocol generation that supports Plug & Charge, richer smart-charging profiles and finer control for network operators. Authentication and payment are handled through RFID, QR codes, mobile applications and POS terminals, and metering is MID certified. Connectivity includes Ethernet, Wi-Fi and 4G, with cloud or mobile monitoring so operators can track charger availability, sessions, energy flows and battery state without a site visit. Language support is English by default, with other languages on request — relevant for distributors and networks deploying across regions.

image

Where the NH-ICS240-261 Fits Best

Fleet depots and logistics hubs with high demand in narrow windows; urban and retail charging hubs where space and connection upgrades are both expensive; highway service areas with high-power but intermittent demand; workplace and commercial car parks layering fast charging onto an existing building supply; sites with on-site PV where the optional PV input interface converts generation into stored charging energy; distributed networks in weak-grid markets where the distribution network is the binding constraint; and integrated energy projects where the same organisation supplies generation and charging infrastructure.

How to Specify an NH-ICS240-261 for Your Site

  1. Grid limit — what maximum import is permitted today, and what would an upgrade cost? This sets the peak-shaving ceiling and how much charging power the battery must supply.
  2. Session profile — vehicles per day and energy per session; divide daily demand by usable energy per cabinet (248 kWh) to size the battery, allowing for windows and turnaround.
  3. Power rating and port split — choose from 120/150/180/210/240 kW and decide between one high-power port or a split across two. The catalogue describes configurations such as 1 × 180 kW or 2 × 90 kW; dwell time and vehicle mix decide.
  4. Connectors — CCS2, CCS1, GBT, CHAdeMO, NACS; mixed fleets and international traffic usually need more than one standard.
  5. Site conditions — verify ambient temperature, humidity and altitude, and check foundation and cable routing against the 1,360 × 1,600 × 2,350 mm footprint and ≤3,000 kg weight.
  6. Commercial and software model — operator-owned versus network models, OCPP requirements (1.6J now, 2.0.1 later), MID metering and payment integration.

Because the charger, the battery and the controls are one product, changes to any of these answers are handled inside a single configuration rather than across multiple vendors’ equipment — a substantial reduction in interface risk on a fast-charging project.

image

AQ: Answer Questions About the NH-ICS240-261

What is the NH-ICS240-261? An integrated energy storage and DC fast-charging system combining a 261 kWh LiFePO4 battery with two EV charging ports at configurable power ratings of 120, 150, 180, 210 or 240 kW, in one floor-standing IP55 and IK10 cabinet.

How much battery capacity does it have? 261 kWh standard, with 248 kWh usable at 95% DoD.

What EV charging power does it deliver? Configurable across 120, 150, 180, 210 and 240 kW, with 400 A system output current and a 150–1,000 VDC range covering passenger EVs and light commercial vehicles. Dual ports can serve one vehicle at high power or split across two.

Which connectors and standards are supported? Two ports in any combination of CCS2, CCS1, GBT, CHAdeMO and NACS, with the charging system referenced to IEC 61851-1, -21-2, -23, -24 and IEC 62196-1 and -3. Authentication via RFID, QR code, mobile app or POS terminal.

What battery chemistry and cycle life does it use? LiFePO4 cells at 832 VDC nominal, operating 728–936 VDC, rated 0.5C, with a stated cycle life of 8,000 cycles.

How does the system reduce demand charges? It monitors site load and discharges the battery whenever demand approaches a configured ceiling, so the grid never sees the charging spike and billed maximum demand stays flat — typically removing a large share of demand-charge cost.

Can it really fast-charge without a grid upgrade? In most constrained-site cases, yes. The battery buffers the difference between the site’s permitted import and the power delivered to the vehicle. Confirm the final configuration against your load profile and tariff before committing.

What fire safety features are included? AI-based early warning plus a composite detector and aerosol fire suppressant at cabinet and pack level, designed to prevent heat diffusion and thermal runaway propagation, with full electrical protection including insulation detection and fault self-diagnosis.

What certifications and environmental ratings does it hold? UN38.3、IEC62477、EN61000、IEC62619、IEC60730、IEC61851、ISO15118; IP55 and IK10 (HMI IK8); −30 °C to 50 °C with derating above 45 °C; humidity below 95% non-condensing; installation up to 2,000 m.

Is it compatible with charging network software? Yes — OCPP 1.6J upgradable to OCPP 2.0.1, Ethernet/Wi-Fi/4G, MID-certified metering and remote cloud or mobile monitoring.

Can it integrate on-site solar? An optional PV input interface lets surplus on-site generation charge the battery directly, converting otherwise curtailed or low-value exported energy into stored charging capacity.

Who manufactures it, and how do I request a quotation? Shanghai Nenghui Technology Co., Ltd., a publicly listed new-energy company (SZ:301046) active in solar and wind generation, energy storage, commercial-vehicle battery-swap and integrated energy services. Request the datasheet and a configuration proposal through the product page or contact@nenghui.com, providing your grid limit, session profile and connector requirements.

image

Next Steps for Site Owners and Network Operators

The NH-ICS240-261 addresses a specific and common problem: sites that need fast charging but cannot obtain — or cannot afford — the grid capacity conventional chargers demand. By integrating a 261 kWh LiFePO4 battery, dual-port DC charging up to 240 kW, MID-certified metering and OCPP connectivity in one IP55 cabinet, it turns a grid constraint into a configuration decision rather than a project blocker. Start with your own numbers — permitted site import, daily energy demand of your vehicle mix, and your tariff structure. Those three inputs determine whether battery-buffered charging is the right architecture, and if it is, they also determine the power rating, battery capacity and port split the site needs.

 